Professional Solar Permit Plan Set
Included In Your BOXED System
At No Extra Cost

(The permit plan set is available for grid-interconnected system only)

Get Your Building Permit Approved
Without A Hassle

The permit plan set that comes with your BOXED grid-tie system is a comprehensive set of print-ready documents that will make the permitting process as easy and quick as possible. It covers standard electrical, structural, and construction requirements to get your solar project approved by your jurisdiction and utility company. The permit plan set can be pre-ordered upon request; please scroll down for more information.

The Plan Set Covers:

Project Summary
Indicating location, vicinity map, the scope of work, contractor information, and project details.
Aerial Site Plan
Showing dimensions, PV array, and equipment placement.
Roof Layout
Including module configuration, string layout, dimensions, and setbacks.
Electric Line Diagram
From PV array to the utility meter, including conductor schedule and electrical calculations.
NEC Compliance Report
Listing of the articles of the National Electrical Code used in your project.
Roof Information
Providing attachment detail, load calculations, and existing roof structure information.
PV Safety Labels
Summary of safety labels required by code.
Manufacturer Datasheets
Specification sheets and compliance documentation for the equipment in your system.
Bill Of Materials
Detailed bill of materials listing all the components in your BOXED system.

PE stamps: we do not include PE (Professional Engineer) stamps required for securing ministerial permits in the plan set.
They are available for an additional cost; please contact us for more information.

I wanted to express my appreciation of Elsa Cubillas’ efforts in providing me with an excellent permit package. She went out of her way to assure that the permit package was accurate. I’m very happy with Elsa’s efforts. I am a fan of Boxed Solar because of her.
Jim P. | Minocqua, WI.

It Comes With Your System
It is Free

We include the permitting plan set in all our BOXED grid-tie systems; we issue it at the time of purchase without additional cost to you. The documentation is customized and drafted with your project specifications. Our turn around time is 2-5 days after system purchase depending on project complexity and current workload.

If you are in a situation where you would like to secure your building permit and interconnection agreement before purchasing the equipment, you may use the form below to order your plan set in advance. We will credit your payment towards the purchase of your equipment.

Don’t know where to start?

We invite you to read our Solar Permitting Guide to learn more about the permitting process for residential solar systems.