Solar Permit Package


The permit package that comes with your BOXED system is a comprehensive set of print-ready documents that will make the permitting process as easy and quick as possible. It covers common electrical, structural and construction requirements to get you solar project approved by your jurisdiction and utility company. The permit package can be pre-ordered upon request, please scroll down for more information.

The Permit Package Covers

  • Project summary

    Indicating location, vicinity map, scope of work, contractor information and project details

  • Aerial site plan

    Showing dimensions, PV array and equipment placement

  • Roof layout

    Including module configuration, string layout, dimensions and setbacks

  • Electric line diagram

    From PV array to utility meter including conductor schedule and electrical calculations

  • NEC compliance report

    Listing of the articles of the National Electrical Code used in your project

  • Roof information

    Providing attachment detail, load calculations and existing roof structure information

  • PV safety labels

    Summary of safety labels required by code

  • Manufacturer data sheets

    Specification sheets and compliance documentation for the equipment in your system

  • Bill of materials

    Detailed bill of materials listing all the components in your BOXED system

* all documentation will be provided in digital format

I wanted to express my appreciation of Elsa Cubillas’ efforts in providing me with an excellent permit package. She went out of her way to assure that the permit package was accurate. I’m very happy with Elsa’s efforts. I am a fan of Boxed Solar because of her.Jim P. | Minocqua, WI.

It Comes With Your System


The permit package is included in all our residential and commercial BOXED grid-tie systems; it is issued at the time of purchase at no additional cost. The documentation is customized and drafted with your project specifications. Our turn around time is 2-5 days after system purchase depending on project complexity and current workload.

If you are in a situation where you would like to secure your building permit and interconnection agreement before purchasing the equipment, you may use the form below to order your permit package in advance. The cost will be fully credited towards your equipment purchase.

ORDER PERMIT PACKAGE

0$

Thanks, we will contact you soon

Pre-Order Your Permit Package

Your payment will be credited at the time the equipment is purchased.

Summary

DescriptionInformationQuantityPrice
Discount :
Total :


/

Stripe

Don’t know where to start?

Use our permitting guide to learn more about the permitting process for PV systems (will open in new window)